ASRY North Development Phase 1
Quay Wall Infrastructure
Scope of work : Carbon Steel Piping Works
Consultant : Royal Haskoning
Main Contractor : Nass Contracting Co. W.L.L.
Period : April 2012 to January 2013
Value : BD 938,795.540

The project was on infrastructure services for North Area of ASRY. Our scope of work included supply, fabrication and testing of Carbon Steel Schedule 80 welded joints pipes and fittings for a approximate total length of 9100 meters ranging from 100 to 300mm diameter in size including supply and installation of 23 numbers fire hydrants, 502 total numbers of valves ranging from 100 to 300mm diameter in size and assembly and fabrication of pumps suction and discharge manifolds.



   
         
   
   
   
   
     
   
     
   
         