Baisan Grande Hotel
Scope of work : Complete MEP Works
Consultant : Habib Modara & GEMAC
Main Contractor : HQ Construction Co. W.L.L.
Period : July 2013 to August 2014 (on-going)
Value : BD 1,150,000.000

The Project is on a 12 storey building (4 Star Hotel) at Juffair. Our scope of work included:

Complete design (with heat load calculation), supply and installation of HVAC system of which we supplied 2 nos Chillers (375 TR each), 2 nos FAHU with heat recovery wheel, 2 nos FAHU, 225 nos of Fan Coil Units, 3 nos Variable Primary Chilled Water Pumps, 2 nos Central Kitchen Exhaust Fans, 2 nos Stair Case Pressurization Fans, 1 no Chilled Water Pressurization Unit and 1 no Chemical Dosing System.

Design, supply & installation of complete plumbing and firefighting system including Transfer Pumps, Booster Pumps, Insulated Water Tanks, Calorifiers, Hot water Re-circulation Pumps, Fire pumps and associated piping works.

Supply and installation of Electrical and Low voltage system.



   
         
   
   
   
   
     
   
     
   
         