Dilmunia Health Island Infrastructure Works – Phase 1
Scope of work : Storm Water, TSE and Foul Sewer Network Piping and Foul Sewer Pumping Stations MEP works
Consultant : Mott MacDonald
Main Contractor : Cebarco Bahrain/Kartec Services SPC
Period : July 1, 2013 to February 28, 2015 (on-going)
Value : BD 395,000.000

The project is on infrastructure services for Dilmunia Health Island under the management of Ithmar Development Company. Our scope of work includes supply, installation, testing and commissioning of 5 Foul Sewer Pumping Stations, supply and installation of uPVC and GRP pipes and fittings for Storm Water and Foul Sewer Network piping for an approximate total length of 6100 meters for Foul Sewer and 4300 meters for Storm Water ranging from 100 to 400mm diameter in size and supply and installation of HDPE pipes and fittings (butt welded joints) for TSE Irrigation Network piping for an approximate total length of 11,960 meters ranging from 50 to 225mm diameter in size including assembly of valve chambers, washout chambers and air valve chambers.

   
         
   
   
   
   
     
   
     
   
         
P.O. Box 541, Manama, Kingdom of Bahrain | t (+973) 1778 8444 f (+973) 1778 6441

Copyright 2013. All Rights Reserved. Created by FOCUS Advertising & Public Relations